Gyprock Ceilings in Perth
Gyprock goes up first and fails first when something goes wrong. We install, repair and replace it across Perth.

Fast, no obligation
Request a Free Quote
Send a few photos of the ceiling and your suburb. About half our quotes go out from photos and a phone call, and you get a straight repair-or-replace answer either way.

At a glance
What Gyprock Ceilings Involves
New installs, repairs and crack fixes on plasterboard ceilings and walls.
Work
Install, Repair, Replace
New sheets, a patch, or the whole ceiling.
Quotes
Often by Phone
About half of ours are done from photos and a call.
Finish
Paint-Ready
Filled, sanded and swept. Painting is separate.
Experience
23+ Years
Perth ceilings, and not much else.
Not sure which of these applies to your ceiling? Send a photo and we will tell you what we are looking at.
Why us
Gyprock Ceilings Done Properly
From a single cracked sheet to a full replacement, gyprock work is our bread and butter. We keep joins tight and finishes clean.
Tight Joins
Correct adhesive, screw spacing and sheet direction. Most recurring cracks are shortcuts, not the house moving.
Right Material Specified
Moisture-resistant in wet areas, fire-rated and acoustic where the build needs it.
Multi-Coat Flushing
Joints built up across coats with drying time between. Rushing it shows the first time light hits them.
Dust Contained
Sheeted off and cleaned as we go. We will be straight with you, some cleaning is left over.
Need gyprock ceilings?
Get honest advice and a written quote. Same-day emergency response too.
(08) 6103 5073Request a quoteIf a ceiling comes down we can usually get there the same day

Our workmanship
Gyprock Ceilings Across the Perth Metro
Gyprock goes up first and fails first when something goes wrong. We install, repair and replace it across Perth.
From a single cracked sheet to a full replacement, gyprock work is our bread and butter. We keep joins tight and finishes clean.
Repair or replace?
Repair or Replace the Sheet?
A single crack is a patch. A sheet that keeps moving is a sheet that needs replacing.

A Repair Suits
- A single crack or hole
- The sheet is otherwise sound
- Recurring cracks at a joint
- Minor impact or screw pops
Filled, sanded and left flat with the rest of the ceiling.
Replacement Is Better When
- The sheet is too damaged
- Mould has penetrated the board
- Large sections have failed
- The ceiling is sagging badly
New sheet is the honest answer once the board itself has gone.
Watch Whether It Comes Back
A crack that reopens in the same place after filling is telling you the sheet or the fixing behind it is still moving. Filling it a second time will not change that.
What we handle
Gyprock Services We Offer
Gyprock Ceiling Repairs
Holes, removed downlights and knocks. Cut back to solid board, patched and flushed to disappear under paint.
Gyprock Replacement
When the sheet is too far gone, or mould has been through it. New board, and the cause dealt with first.
Commercial Gyprock
Shopfits, fitouts and makegoods. Scheduled around trading, sheeted off, planned around the other trades.
Sagging Gyprock
Same causes as plasterglass, usually later. Any give at all means the sheet has come away.
Gyprock Walls
Damaged sections, new partitions, making good. Done with the ceiling means one setup and one clean-up.
Crack Repair
A crack that keeps coming back was filled, not fixed. We cut it out and re-tape it.

Left paint-ready
Paint-Ready, and Honest About the Rest
Drop sheets go down before anything comes off, we sweep, we cart the waste away and the ceiling is left at a paint-ready standard. You clear the room first, and where new cornice goes in the walls will want repainting as well. Better said now than on the day.
How it works
How We Get It Sorted
Quote and Material Spec
Send photos and room sizes, and we specify the right board.
Prepare the Area
Floors covered, furniture moved, dust contained.
Fit the Sheets
Cut to size and fixed to the joists with tight joins.
Flush, Sand, Walkthrough
Joints flushed across coats and sanded to a paint-ready finish.

Common questions
Gyprock Ceilings Questions, Answered
They are the same thing. Gyprock is a brand name for CSR plasterboard, and in Australia the word gets used for plasterboard generally.
It is worth knowing because quotes and product lists use the terms interchangeably, and it occasionally makes people think they are being quoted on two different materials.
What does differ is the board type within that: standard, moisture-resistant, fire-rated and acoustic sheets are not interchangeable.
Yes. Drywall is the American term, gyprock is what most Australians say, and plasterboard is the technical name. All three mean the same sheet.
Plasterglass is the one that is genuinely different, and it is the one that matters in Perth: an older sheet product glued to the joists, which is behind most of the sagging ceilings in homes built between 1970 and 2000.
If your ceiling is dropping evenly across a whole room rather than cracking in one spot, plasterglass is the likely answer.
It depends on the size, whether it is a new install, a repair or a replacement, and the board type. Every job is quoted in writing before it starts.
The smallest job we take on is a patch of about a square metre, and that starts at $700 before painting.
The thing that moves a price most is what is above the sheet. Twisted or bowed joists mean reframing before new board can sit flat, and none of that is visible until the old ceiling is off.
Yes. New sheeting, setting and finishing for extensions, garage conversions and renovations, left ready for the painter.
On a renovation the sequence matters as much as the work: the electrician makes the lights and fans safe first, the ceiling goes in, then the painter follows. We coordinate that so nobody is waiting on anybody.
Wet areas get moisture-resistant board and anywhere the build requires it gets fire-rated sheet. Using standard board in a bathroom saves very little and costs a ceiling later.
A standard room is usually sheeted and set across a few visits, because the joints have to dry between coats. You get a timeframe with the quote.
A single room, ceiling down and back up without painting, is about a day on site. Two days with the painting to follow.
Rushing the flushing is what gives you a ceiling that looks fine at handover and shows every join a month later when the light hits it.
Yes. The old ceiling comes down, the debris is cleared and the waste is carted away, and we sweep and wipe down before we leave.
Being straight with you: it is a filthy job and there will still be some cleaning left for you afterwards. We would rather say that now than have you find out on the day.
You will also need to clear the room yourself before we start, because things get damaged otherwise and nobody enjoys that conversation.
Not on the list? Send a few photos and your suburb, or just ring and ask.
Related services
Other Ceiling Work We Do
Ceiling Replacement
Full strip-out and rebuild when a repair simply will not hold anymore.
Learn moreSagging Ceiling Repair
Fibreglass re-strapping that anchors a dropping ceiling back to the joists for decades.
Learn moreCommercial Ceilings
Suspended grid, gyprock and fitout ceilings for Perth businesses.
Learn moreCeiling Problem? Get a Free Quote Today.
Send through a few photos and your suburb, and we'll come back with honest advice and a written quote.